Munich embraces Linux at last
News But the €30m project, dubbed LiMux, hit numerous delays after a dispute over software patents, extended contractual negotiations and a 12-month extension to the project pilot phase. The City of Munich has finally started to migrate to Linux on the...
[September 25, 2006, 17:30]
TimeLeft for Wine
Downloads TimeLeft is a clock, countdown, Web countdown, work days and work hours countdown, reminder (including Moon phase reminder), alarm clock, stopwatch, timer, desktop sticker, eBay auction watch, and time synchronization utility.
[November 7, 2008, 12:19]
Next-to-last GPL 3 draft due this week
News A new phase of wrangling over the future of the dominant open source licence, the General Public License (GPL), is set to begin on Wednesday and to end 90 days afterward. The third discussion draft of GPL version 3 is scheduled for release at 0700...
[March 27, 2007, 9:14]
CashflowHawk
Downloads CashflowHawk is the ideal app to carry when you are in the decision phase of any major purchase or investment. Make informed decisions on the go and take control of your cashflow! Property Cashflow (Advanced): Calculate and save detailed property...
[March 30, 2009, 8:00]
Happy Clown Screensaver-special offer in financial crisis
Downloads April Fools'' Day is just upcoming, and in this special phase, we provide you the happy clow to inspire you keeping the optimistic attitude.A product of MMMOOO Premium Service: 1. Premium class in quality & designing 2.
[March 23, 2009, 7:00]
A Phased Approach to Network Access Control (NAC)
White Papers In its genesis phase, NAC was really a concept and no more. Network Access Control (NAC) is a classic example of industry hyperbole at work. Soon it was embraced as an end-to-end architecture flush with competing industry standards and grand visions.
[August 5, 2009, 1:21]
BEHRINGER Tunes Up Communications Links With Verizon Business
White Papers BEHRINGER quickly realized that its existing decentralized network was unsuitable for this phase of its growth. BEHRINGER was unable to obtain a holistic view of its IT assets and current data usage, making the implementation of new applications...
[May 30, 2009, 1:19]
Mars Soldiers-7
Downloads Features of the game: the original two-phase move of the personage; multy-personage orders; big set of functions for control, selection and searching soldier; two companies (for earth and for mars), consisting of 7 levels; two players game...
[September 16, 2008, 10:27]
Dynamics Performance of Carrier and Code Tracking Loops in Ultra-Tight GPS/INS/PL Integration
White Papers Integrating the correlator measurements, I (in-phase) and Q (quadrature), with position, velocity and attitude from INS in a Kalman filter characterizes the ultra-tight GPS/INS integrated system. The Doppler feedback derived from the corrected INS...
[November 14, 2009, 23:00]
MSDN Architecture Webcast: Architecture: Automating Software Development Testing (Level 200)
White Papers The presenter of this webcast explains about the implementation of architecture testing that takes place at the design phase of the software creation process. The webcast covers and provides a framework for use in executing automated architecture...
[September 6, 2008, 1:01]
First Step for Your Virtual Desktop Initiative: Conduct a Proof-of-Concept
White Papers The next step immediately following will be the planning and design phase whereby eight different topic areas will be covered in depth to determine the best solution design. Proof-of-Concept and intelligence gathering are the first steps.
[November 13, 2009, 0:21]
A Best Practice Approach to Implementing a Proactive Patch Management Strategy
White Papers A best practice approach to the planning phase ensures that the service levels required by the business can be defined correctly. A successful patch management strategy requires planning, implementation and operational best practices.
[April 9, 2008, 1:02]
SGI to shutter Irix this year
News Silicon Graphics will phase out its Irix operating system and the MIPS chip-based computers the Unix variant runs on at the end of the year, 18 years after the once-vaunted computing company introduced the technology.
[September 11, 2006, 12:00]
Accelerating Retail Business Intelligence
White Papers Oracle Retail Business Intelligence Accelerator jumpstarts the business intelligence initiative in each phase of the project lifecycle, enabling a faster ROI on the project. The business intelligence solution provides retailers with packaged...
[November 3, 2005, 0:00]
TaBulator [projects]
Downloads TaBulator [projects] displays a handy project number reference (useful for entering and tracking time) with project phase names and numbers showing in convenient tool tips. Click on any project for detailed project information direct from...
[September 21, 2004, 8:00]
Tesco to track milk deliveries by RFID
News The move signals the next phase of Tesco's RFID plans, which involve using permanent radio tags on "returnable transport items" such as the cages and trolleys used when goods are delivered from distribution centers to the supermarket stores.
[June 2, 2006, 9:40]
RFID gathering pace
Talkback The report said RFID had moved past the early adoption phase, but never stated that RFID was a mature market. The report was by Regan Jacob and Sydney.
[January 25, 2006, 11:12]
Honeywell Uses Smart Tags to Improve Interoperability, Save $1.5 Million Annually
White Papers Early in the design phase, they consult parts data that resides in an SAP R/3 ERP system, and parts drawings that reside in a Linux-based Product Data Management (PDM) application. Honeywell Transportation Systems employs thousands of engineers who...
[March 1, 2008, 0:02]
Whats beyond your Windows?
Blog With Windows XP now officially into it's end-of-life phase, and Vista waiting in the OEM wings, BitSmith has been road testing some alternatives. The vast majority of road users are drivers (for which read Windows users).
[July 17, 2008, 14:17]



